A unique feature of the Ram Temple is the Surya Tilak mechanism. It is designed in such a way that the Sun rays will fall on the forehead of Lord Ram’s Idol at 12 noon on Sriram Navami day every year for about 6 minutes.
- Indian Institute of Astrophysics Bengaluru provided technical support on Sun’s path and Optica, Bangalore is involved in manufacturing of the lenses and brass tubes.
- Ram Navami, celebrated on the ninth day of the first month of the Hindu calendar, which is usually in March-April, marks the birthday of Lord Rama, the seventh incarnation of Lord Vishnu.
- Tulip Blooms: CSIR-IHBT Palampur (HP) sent Tulip Blooms to the divine Ram Mandir Pran Pratishtha ceremony in Ayodhya on 22nd January. Tulip does not flower in this season. It grows only in Jammu & Kashmir and few other higher Himalayan regions and that too only in the spring season.
- The Institute of Himalayan Bioresource Technology Palampur has recently developed an indigenous technology through which tulip could be made available throughout the year, without waiting for its season.
- Main temple building: The main temple building, which is 360 ft long, 235 ft wide and 161 ft high, is made of sandstone quarried from Bansi Pahadpur, Rajasthan. Cement or iron and steel is not used anywhere in its construction.
- The Structural Design of the 3-storey temple is designed earthquake resilient and can withstand strong tremors of magnitude 8 on the Richter scale for as long as 2,500 years.