NHPC Limited (A Govt. of India Enterprise) and Vidhyut Utpadan Company Limited (VUCL), Nepal signed an MoU (Memorandum of Understanding) in New Delhi for development of Phukot Karnali Hydro Electric Project (480MW) in Nepal.
Key points
- The MoU was signed in the presence of Prime Minister of India Shri Narendra Modi and Prime Minister of Nepal Shri Pushpa Kamal Dahal ‘Prachanda’ at Hyderabad House in New Delhi.
- The project will use the flow from the Karnali River for power generation and the generated power will be fed into integrated power system of Nepal.
- The installed capacity of the project shall be 480 MW with average annual generation of about 2448 GWh.
- The key features of the project are a 109 metre high RCC dam and an underground power house where the 06 turbines of 79 MW each shall be housed.
- Additionally, to utilize minimum environmental release one Surface Power House of 6 MW capacity i.e. two machines of 3 MW each is also planned.