The Ministry of New & Renewable Energy (MNRE) is conducting a program on Renewable Energy namely “New Frontiers” as part of Azadi ka Amrit Mahotsav celebrations.
- The program will be held from 16th February to 18th February 2022.
- As part of the program, the Ministry will conduct a physical event on the topic titled, “India’s Leadership in Energy Transition” at Vigyan Bhawan on 16th February 2022.
India’s installed Renewable Energy (RE) capacity
- India’s installed Renewable Energy (RE) capacity stands at 150.54 GW (solar: 48.55 GW, wind: 40.03 GW, Small hydro Power: 4.83, Bio-power: 10.62, Large Hydro: 46.51 GW) as on 30.11.2021 while its nuclear energy based installed electricity capacity stands at 6.78 GW.
- This brings the total non-fossil based installed energy capacity to 157.32 GW which is 40.1% of the total installed electricity capacity of 392.01 GW.
- The Government aims to achieve 500 GW of installed electricity capacity from non-fossil fuel sources by the year 2030.