The union cabinet has approved the mission to moon, named Chandrayaan-4 to develop and demonstrate the technologies to come back to Earth after successfully landing on the Moon and also collect moon samples and analyse them on Earth.
- This Chandrayaan-4 mission will achieve the foundational technologies capabilities eventually for an Indian landing on the moon (planned by year 2040) and return safely back to Earth.
- Major technologies that are required for docking/undocking, landing, safe return to earth and also accomplish lunar sample collection and analysis would be demonstrated.
- The total fund requirement for the technology demonstration mission “Chandrayaan-4” is Rs. 2104.06 Crore.
- The cost includes spacecraft development and realization, two launch vehicle missions of LVM3, external deep space network support and conducting special tests for design validation, finally leading to the mission of landing on moon surface and safe return to Earth along with the collected lunar sample.
- The mission would enable India to be self-sufficient in critical foundational technologies for manned missions, lunar sample return and scientific analysis of Lunar samples.